South Burnaby Industrial park development

 Beedie Group 5255 North Fraser Way — a 14.9-acre property. 233,000 sq ft of warehouse space, plus 101,000 sq ft of warehouse-serving office space. The total floor area is 334,000 sq ft.

Warehouse Developments in Surrey

Walmart Distribution center (Surrey)- The “fulfillment center” at 18860, 24 Ave, Surrey, BC V3S 9V2 is about 300,000 square feet and is expected to open in early 2022 and will provide fresh and frozen food to 60 British Columbia Walmart stores with a focus on sustainability and no waste.

Sobeyes  Distribution center (Surrey) – Sobeys plans to build 530,563. square Ft. of warehouse and distribution facility in Campbell Heights Industrial Area, South Surrey. Much of the building – planned for 18890 22 Ave. – is to be refrigerated to allow for the handling of products and other food products according to the development proposal.

BC Liquor Distribution Branch Distribution Centre Project (2017)- BCLD is leasing an existing 412,000 square foot warehouse. The estimated capital cost is $57.135 million, not including lease costs. Check out the Project Plan .PDF here

Warehouse Developments in Abbotsford​

Univar Canada Inc. has a proposal to build a 68,000-sqft distribution facility on a five acre site located at 3256 McCallum Rd, Abbotsford, BC V2S 7W6. Univar says the plant will employ around 50 people.