Golden Ears Business Park Phase 3 and Phase 4

ONNI Group

PHASE 1 (19100 Airport Way):
BUILDING 100

  • #114 – 3,163 SF – Available December 1, 2020
  • #106 – 6,633 SF – Available Immediately

PHASE 2 (19055 Airport Way):
Fully Leased

PHASE 3 (Address TBD):
BUILDING 3100 & 3200 – Anticipated Q3 2021

  • 4,000 SF to up to 250,000 SF

South Burnaby Industrial park development

 Beedie Group 5255 North Fraser Way — a 14.9-acre property. 233,000 sq ft of warehouse space, plus 101,000 sq ft of warehouse-serving office space. The total floor area is 334,000 sq ft.

Warehouse Developments in Surrey

Walmart Distribution center (Surrey)- The “fulfillment center” at 18860, 24 Ave, Surrey, BC V3S 9V2 is about 300,000 square feet and is expected to open in early 2022 and will provide fresh and frozen food to 60 British Columbia Walmart stores with a focus on sustainability and no waste.

walmart distribution cambell heights-min

Sobeyes  Distribution center (Surrey) – Sobeys plans to build 530,563. square Ft. of warehouse and distribution facility in Campbell Heights Industrial Area, South Surrey. Much of the building – planned for 18890 22 Ave. – is to be refrigerated to allow for the handling of products and other food products according to the development proposal.

BC Liquor Distribution Branch Distribution Centre Project (2017)- BCLD is leasing an existing 412,000 square foot warehouse. The estimated capital cost is $57.135 million, not including lease costs. Check out the Project Plan .PDF here

Warehouse Developments in Abbotsford​

Univar Canada Inc. has a proposal to build a 68,000-sqft distribution facility on a five acre site located at 3256 McCallum Rd, Abbotsford, BC V2S 7W6. Univar says the plant will employ around 50 people.

World Commodity Trade Center

Located at 3450 192 St, Surrey, BC V3S 0L5 on a sprawling 21.19 acres of land, includes six seperate buildings with a floor area of 54,000 sq.-ft